WILD MANUAL · REFUSALS

We publish what we will not do.

A standard written after the work cannot fail the work. Every refusal below is a job we turn down on that basis, and it stays here whether or not it costs us the order.

PUBLISHED REFUSALS

6 refusals published

GRADED AGAINST the unit record, where every published unit carries one

PUBLIC Refused against a standard anyone can read

  1. Single Sheet Field Test

    DECLINED

    Redrawing from a photograph or a raster scan, which is draughtsmanship and is not sold here

    GRADED INSTEAD AGAINST 37 CFR 1.84

  2. Utility Patent Drawing Sheets

    DECLINED

    Redrawing from a photograph or a raster scan, which is draughtsmanship and is not sold here

    GRADED INSTEAD AGAINST 37 CFR 1.84

  3. Commercial Lease Abstracts

    DECLINED

    The lease classification conclusion and every other accounting judgement, which your controller makes

    GRADED INSTEAD AGAINST FASB ASC Topic 842

JURISDICTION Refused against a published checklist

  1. Permit Plot Plan Sheets

    DECLINED

    Reading parcel geometry out of a scanned survey or plat, which is not machine-readable and is not sold here

    GRADED INSTEAD AGAINST the receiving jurisdiction published plot plan checklist

BUYER Refused because the standard would arrive after the work

  1. Document Extraction Runs

    DECLINED

    Any conclusion drawn from the extracted values, which is your judgement to make

    GRADED INSTEAD AGAINST your written field list and your ten-document labelled sample

  2. Workflow Acceptance Runs

    DECLINED

    Work with no written acceptance test, which is declined rather than scoped on a call

    GRADED INSTEAD AGAINST the written acceptance test supplied with the order

Every unit, with what it costs and what decides it