Formal drawings

Utility Patent Drawing Sheets

Formal utility drawing sheets for a complete application, drawn from your disclosure to 37 CFR 1.84 and priced per sheet.

The full FIG. 1 to FIG. n set as filing-ready PDF plus editable vector source, with a numeral index that reconciles to the specification.

Best fit

The buyer and the boundary.

A patent prosecution paralegal, docketing manager, or solo practitioner at a firm that files utility applications every month.

You send

  • The draft specification or invention disclosure
  • Sketches, CAD files, photographs, or provisional figures
  • The reference numeral list, or a note to build one from the specification
  • The filing date you are working to

I deliver

  • Every figure the disclosure requires, priced one sheet at a time
  • Filing-ready PDF and editable vector source
  • Numeral index reconciling each numeral to the specification text
  • Sectional, exploded, and detail views where the disclosure calls for them
  • One written correction round against a drawing objection
  • Your firm sheet conventions kept on file for the next matter
  • Reorder by replying to the delivery email with the next disclosure

Definition of done

Check it in under five minutes.

  • Sheet size and margins follow 37 CFR 1.84(f) and 37 CFR 1.84(g)
  • Views are arranged and numbered under 37 CFR 1.84(h), 37 CFR 1.84(i), and 37 CFR 1.84(u)
  • Lead lines and arrows follow 37 CFR 1.84(q) and 37 CFR 1.84(r)
  • Lettering meets the 0.32 cm minimum in 37 CFR 1.84(p)(3)
  • Every numeral in the drawings appears in the specification, and every numeral in the specification appears in the drawings

Named exclusions

Finite by design.

Anything outside this list and the written scope becomes a new fixed-price change, not invisible extra work.

  • Patentability, freedom to operate, and claim scope opinions
  • Preparing or filing any USPTO paper, which your practitioner signs and files
  • Specification, claim, and abstract drafting
  • Photographs in place of drawings under 37 CFR 1.84(b)
  • Color drawings, which require a petition under 37 CFR 1.84(a)(2)

The next step

A written scope before access.

Send the current state and the artifact you need. The reply will name the smallest useful boundary, price, inputs, and start condition.

Start this inquiry